| |
PROJECT
|
 |
CLIENT |
CLIENT |
| |
Erection of pennstock. Hydroelectric of Pinalito. Constanza, Dominican Republic. 2006 - 2007 |
|
Constructora Norberto Odebrecht
|
|
| |
Mechanical erection of hydroelectric power plant.
Los Toros – Dominican Republic, 2000. |
|
Babcock &
Wilcox
Española |
|
| |
Electromechanical
erection of hydroelectric power plant 2 x 2 MW. Mao (Monción)
– Dominican Republic, 1997. |
|
Agroman
|
|
| |
Engineering, supply and installation
8 Km., 12.5 KV. transmission line. Mao (Monción) –
Dominican Republic, 1996. |
|
Agroman
|
|
 |
Mechanical erection hydroelectric power plant
2 x 15 MW including penstocks, gates, overhead crane, piping,
turbine generator and all mechanical erection. Río Blanco
– Dominican Republic. 1995-1996. |
|
Cegelec |
|
 |
Electromechanical erection 2 x 1 MW hydroelectric
power plant including 180 mts. penstock 10 Km 12.5 KV transmission
line and substation. Jánico – Dominican Republic,
1993-1994.
|
|
INDRHI |
|